Status of Manali to Leh road as on 27th of May 2016 : OPEN
Update 16th of May : Rohtang pass has been opened up but BRO is still working on Baralacha pass. BRO has suggested that The whole Manali to Leh stretch will be cleared and open for traffic before the end of May if all goes to plan.
Update 27th of May : Road from Rohtang pass through to Keylong has a lot of slush on it and tarmac is in pretty bad condition. BRO is working on improving the broken patches but right now it is not a good idea for motor bikes on that route.
Update 29th of May 2016 : Traffic is flowing smoothly but there is still a lot of slush on roads between Rohtang pass and Keylong. There is hardly any water at water crossings due to whihc traffic jams are caused but right now traffic is flowing smoothly at water crossings as well.
Update 16th of May : Rohtang pass has been opened up but BRO is still working on Baralacha pass. BRO has suggested that The whole Manali to Leh stretch will be cleared and open for traffic before the end of May if all goes to plan.
Update 27th of May : Road from Rohtang pass through to Keylong has a lot of slush on it and tarmac is in pretty bad condition. BRO is working on improving the broken patches but right now it is not a good idea for motor bikes on that route.
Update 29th of May 2016 : Traffic is flowing smoothly but there is still a lot of slush on roads between Rohtang pass and Keylong. There is hardly any water at water crossings due to whihc traffic jams are caused but right now traffic is flowing smoothly at water crossings as well.